X” series platform assembly - reverse – Grain Systems Bin Accessories PNEG-1787 User Manual

Page 23

Advertising
background image

4. 72'-135' Assembly Instructions

PNEG-1787 42'-135' “X” Series Sidewall Stair and Eave Platform

23

72'-135' Eave Platform and Manway Guard Sub-assemblies
(Continued)

“X” Series Platform Assembly - Reverse

1.

Figure 4J

shows the assembly of the platform supports. Use 5/16"

hardware at all the connection

points. (The bin wall and platform floor is hidden for clarity. Platform floor will have to be attached
at the same time as support angles.)

Figure 4J

2.

Figure 4K

shows the assembly of the platform toe plate, handrail post, platform post and platform

floor system. This must all be assembled at the same time using 5/16" hardware.

Figure 4K

Advertising