Grain Systems Tanks PNEG-1923 User Manual
General assembly instructions, Instructions, 10° roof assembly instructions
Date: 04-10-13
PNEG-1923
Instructions
1004 East Illinois Street • Assumption, IL 62510 • 1-217-226-4421
PNEG-1923
Printed in the U.S.A.
Copyright © 2013 by GSI Group
www.gsiag.com
Page 1 of 7
CN-304634
10° Roof Assembly Instructions
IMPORTANT: Read all instructions BEFORE STARTING ASSEMBLY.
Refer to Bulk Feed Tank manual for additional assembly information. These instructions apply only to the
assembly of the 10° roof.
IMPORTANT: All tanks with 10° roofs must be assembled vertically to avoid damage to component parts.
General Assembly Instructions
1. Assemble top sidewall sheets. (Refer to Bulk Feed Tank manual.)
NOTE: Top ring is special 16 gauge (Color Code Blue).
2. Beginning with the second vertical row of holes (clockwise) from the sidewall vertical seam,
assemble an eave support bracket, spacers and an eave seal angle to the top sidewall sheet.
On every third vertical row of holes thereafter, attach another eave support bracket with spacers.
Refer to
and
for assembly diagrams and details. Be sure to
caulk all areas indicated.
3. Assemble roof panels to the eave support brackets, eave seal angles and peak ring. Roof panel
seams are located at each eave support bracket. Note roof panel overlap and caulking detail. Roof
panels must be supported at 10° angle during assembly. Remove supports when roof assembly
is complete.
4. Assemble guardrail brackets to the top sidewall sheets, starting again with the second vertical row of
holes (clockwise) from the sidewall vertical seam. Every fourth vertical row of holes thereafter, attach
another guardrail bracket.
5. Assemble guardrail posts to guardrail brackets. Refer to guardrail and safety cage assembly diagram
in
for details.
6. Assemble guardrail tubes and toe boards to guardrail posts. (None at ladder location.)