Assembling the center collar, Chapter 7: roof assembly – Grain Systems Tanks PNEG-4135A User Manual
Page 120

NOTE: Eyebolt will pass through three layers of steel: the splice plate (V), the center cap plates (L
and M), and the long center collar channels (I).
32.Tighten all hardware to the recommended torque specifications. See
.
Figure 7-32 Installing the cap plates
A
3/8 in. nut (S-456)
Q
Side cap plate (CTR-0360)
L
Center cap plate (CTR-0281)
R
Side cap plate (CTR-0323)
M
Center cap plate (CTR-0325)
S
Side cap plate (CTR-0324)
N
Tube caulk
V
Splice plate (CTR-0326)
P
3/8 x 1 in. bolt with sealing washer (S-7487)
W
Vendor lifting eyebolt
Assembling the Center Collar
The center collar assembles each A-frame roof rafter section together at the top. The center collar assem-
bly is a three piece design and will need to be spliced together with splice plates.
Before You Begin
120
Pneg-4135A 135 Ft Diameter 40-Series Bin