Attach upper ceiling bracket (A) to lower ceiling bracket (B) by inserting four carriage bolts (C) through holes of
ceiling brackets (A & B). Fasten bolts (C) with four washers (E) and nylock nuts (D) as shown.
Note: Adjust lower ceiling bracket (B) until it is level before tightening nuts (D).
D
E
C
B
A
Screw extension column into lower ceiling bracket (B) and align slot of
extension column with one of the holes in lower ceiling bracket (B). Thread M5
x 10 mm self-tapping screw (G) through lower ceiling bracket (B) into
extension column as shown in detail 1.
Note: 3/4" extension column (FLP series) can be used in place
of the EXT or ADJ series. Two pipe reducers (ACC 913) are
required for installing the 3/4" column.
1-1/2" Extension Column Application (EXT or ADJ series)
B
G
EXTENSION
COLUMN
DETAIL 1
SLOT
©
2004 Peerless Industries, Inc. All rights reserved.