Maintenance, Schedule, Step 3 - install the piping – Xylem MM 320C Series 851, 851 2 and 847 Make-up Water Feeders User Manual

Page 4

Advertising
background image

MAINTENANCE

SCHEDULE:

• Disassemble and inspect annually. Replace the

water feeder if it is worn, corroded, or if

components no longer operate properly.

• Replace control every 15 years. More frequent

replacement may be required when severe

conditions exist such as surging water levels and

use of water treatment chemicals.

STEP 3 - Install the Piping

Strainer
Basket
Assembly

Swing Check Valve

By-pass

Hand By-Pass Valve

Connect to return
header on boiler
side of all valves

City Water
Supply

Supply To
Feeder

a. Follow the drawing to the right for piping the

valve to boiler and city water supply. When
piping the valve remember to leave room for
servicing the valve. This will aid in trouble-
shooting the valve and piping in the future.

Piping the Valve on Series 847 and 851

Piping the Valve on Series 851-S

Swing Check Valve

By-pass

Hand By-Pass
Valve

Connect to return
header on boiler
side of all valves

CAUTION
Before turning
on city water
pressure be
sure to open
this valve

City Water
Supply

Supply
Valve

Strainer
Basket
Assembly

a. Follow the drawing to the right for piping the

valve to the boiler and city water supply.
When piping the valve remember to leave
room for servicing the valve. This will aid in
troubleshooting the valve and piping in
the future.

• Disassemble and inspect the strainer screen

annually. Thoroughly clean the strainer screen

or replace.

• Remove and inspect cartridge annually.

Thoroughly clean by rinsing with clear water

or replace.

Xylem Inc.

8200 N. Austin Avenue

Morton Grove, Illinois 60053

Phone: (847) 966-3700

Fax: (847) 965-8379

www.xyleminc.com/brands/mcdonnellmiller

McDonnell & Miller is a trademark of Xylem Inc. or one of its subsidiaries.

© 2013 Xylem Inc. MM-320C July 2013 Part No. 210528

Advertising