5 installation – Elmo Rietschle F-CEV-D User Manual

Page 14

Advertising
background image

14

|

www.gd-elmorietschle.com © Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH

Installation

5 Installation

5.1

Preparing for installation

Check the following points:

Machine freely accessible from all sides

Do not close ventilation grids and holes

Suffi cient room for installing and removing pipes
and for maintenance work, particularly for install-
ing and dismantling the machine

No external vibration effects

Do not suck any hot exhaust air from other ma-
chines into the cooling system.

The cooling air inlets (Fig. 2/E) and the cooling air outlets (Fig. 2/F) must be at least 10 cm away
from adjacent walls. Cooling air coming out must not be sucked in again.
Additionally care should be taken that the suction air entry (Fig. 2/A

1

) and the exhaust air exit

(Fig. 2/B

1

) are not obscured.

5.2 Installation

NOTICE

We would recommend placing the units on rubber
feet for trouble free operation.

Material damage resulting from the machine
tipping over and falling.

When installed at more than 1000 m above sea
level a reduction in power is noticeable. In this
case we would ask you to contact us.

Ensure that the foundation complies with the follow-
ing conditions:

Even and level

The bearing surface must be designed to be
able to take the weight of the machine

It is possible to install the machine on a fi rm base without anchoring. When installing on a sub-
structure we recommend fi xing with fl exible buffers.