3. central process unit (cpu) installation – I-View Digi-4800XP 16 channels Hybrid Embedded DVR User Manual
Page 26
26
2-3.
Central Process Unit (CPU) Installation
2-3-1.
CPU Installations: Power Management Setup
The DVR’s board comes with a surface mount Socket 775 (LGA775) design for Intel Pentium 4
Processor in the 755-land package.
Follow the steps below for CPU installation
1.)
Locate the CPU socket on the platform. (Fig. 2-3.1).
2.)
Press the load lever with your thumb (A) and remove it to the left (B) until it is released from the
retention tab. (Fig. 2-3.2)
3.)
Lift the load lever in the direction of arrow to a 135-degree angle. (Fig. 2-3.3).
4.)
Lift the load plate with your thumb and forefinger to a 100-degree angle (A), and then push the
PnP cap from the load plate window to remove (B). (Fig. 2-3.4).
5.)
Position the CPU over the socket, making sure that the gold triangle is on the bottom-left corner
of the socket. The socket alignment key should fit into the CPU notch. (Fig. 2-3.5).
Fig.2-3-1.1
Fig.2-3-1.2
Fig.2-3-1.3
Fig.2-3-1.5
Fig.2-3-1.4
Fig. 2-3-1.6