Installation, Warning ! warning, Dguii/dgfu – EBARA CGUII, CGFU User Manual
Page 6: Ebara submersible grinder pumps, Operating, installation, and maintenance, Electrical wiring
EBARA Submersible Grinder Pumps
DGUII/DGFU
Operating, Installation, and Maintenance
EBARA
Fluid Handling
www.pumpsebara.com
6
(t) 803 327-5005 • (f) 803 327-5097
rev. 11/05
Check that the power is locked off and disconnected before working on pump. All electrical work
should be performed by a qualified electrician and all national and local electrical codes must be
observed.
Installation
3. Electrical wiring:
(1) Wiring
a) Wire as indicated for the appropriate start system as shown in Fig. 3.
b) Loose connections will stop the pump. Make sure all electrical connections are secure.
Manual Operation Type – Single Phase
Model DGFU, DGUII, DGFMU
Output 2 to 5HP
Fig. 3
G : GREEN
L
1
: RED – T1
L
2
: WHITE – T2
L
3
: BLACK – T3
P
1
: RED
P
2
: WHITE
P
3
: BLACK
P
4
: ORANGE
G : GREEN
OUTPUT
HP
2
3
5
kw
1.5
2.2
3.7
SC : STARTING CAPACITOR
250VAC 161~193µF
250VAC 270~324µF
250VAC 216~259µF
RC : RUNNING CAPACITOR
440VAC 25µF
440VAC 35µF
440VAC 55µF
R : RESISTOR
50~60k
Ω 2W
29~36k
Ω 2W
36~43k
Ω 2W
STARTING RELAY
(Mft: General Electric)
3ARR3 FJ4EK2 RELAY
MODEL No. 6×557
3ARR3 FJ4EK2 RELAY
MODEL No. 6×555
3ARR3 FJ4EK2 RELAY
MODEL No. 6×555
EBARA capacitor pack is required on single phase pumps. Warranty will be void if capacitor pack is not used.
Warning
!
Warning
!