Check that the power is locked off and disconnected before working on pump. All electrical work
should be performed by a qualified electrician and all national and local electrical codes must be
observed.

Installation

3. Electrical wiring:

(1) Wiring

a) Wire as indicated for the appropriate start system as shown in Fig. 3.
b) Loose connections will stop the pump. Make sure all electrical connections are secure.

Manual Operation Type – Single Phase

Model DGFU, DGUII, DGFMU
Output 2 to 5HP

Fig. 3

G : GREEN
L

1

: RED – T1

L

2

: WHITE – T2

L

3

: BLACK – T3

P

1

: RED

P

2

: WHITE

P

3

: BLACK

P

4

: ORANGE

G : GREEN

OUTPUT

HP

2

3

5

kw

1.5

2.2

3.7

SC : STARTING CAPACITOR

250VAC 161~193µF

250VAC 270~324µF

250VAC 216~259µF

RC : RUNNING CAPACITOR

440VAC 25µF

440VAC 35µF

440VAC 55µF

R : RESISTOR

50~60k

Ω 2W

29~36k

Ω 2W

36~43k

Ω 2W

STARTING RELAY

(Mft: General Electric)

3ARR3 FJ4EK2 RELAY

MODEL No. 6×557

3ARR3 FJ4EK2 RELAY

MODEL No. 6×555

3ARR3 FJ4EK2 RELAY

MODEL No. 6×555

EBARA capacitor pack is required on single phase pumps. Warranty will be void if capacitor pack is not used.

Warning

!

Warning

!

Advertising
This manual is related to the following products: