Harrington Hoists and Cranes AHM Hoist User Manual
Page 40
40
Figure 7-5 3-Hose Pendant Connections
7.3.3
The following procedure covers the installation of the Coil Hose (Parts List Figure Number 202) onto
the Manifold Block and Manipulator Control. Refer to Figure 7-6.
1) Insert all 3 hoses through the large opening in the Hose Support. Slide the Hose Support around
approximately 1 coil of the hose.
2) At the hoist, insert all 3 hoses through the Hose Arm attached to the hoist body then insert the
Down Tube through the small opening in the Hose Support.
3) Firmly press the 3 Pendant Hoses completely into the Hose Fittings on the Manifold Block until
they bottom out. Refer to Figure 7-6 for the correct placement of the Hoses.
4) At the Manipulator Control, insert all 3 hoses through the Hose Hole on the Manipulator Control.
5) Firmly press the 3 Pendant Hoses completely into the Hose Fittings on the Manipulator Control
until they bottom out. Refer to Figure 7-6 for the correct placement of the Hoses.
6)
Operate hoist and make sure the hook travel is in the same direction as
shown on Manipulator Control.