Part 2, Prepare the storage tank, A. specifications and performance ratings – HTP GL-175 User Manual

Page 4: Part 2 – prepare the storage tank

Advertising
background image

4

LP-181 Rev. 3.25.14

PART 2 – PREPARE THE STORAGE TANK

UNCRATING STORAGE TANK

– Any claims for damage or shortage in shipment must be filed immediately against the transportation

company by the consignee.

COLD WEATHER HANDLING

– If the storage tank has been stored in a very cold location (BELOW 0

o

F) before installation, handle

with care until the plastic components come to room temperature.

Remove all sides of the shipping crate to allow the storage tank to be moved into its installation location.

A. SPECIFICATIONS AND PERFORMANCE RATINGS

Figure 1

– Specifications and Dimensions

Advertising
This manual is related to the following products: