Data entry & error messages deep vacuum – MAHLE RTI Matco AC2880 User Manual

Page 10

Advertising
background image

Page 8

Data Entry & Error Messages

DEEP VACUUM

1. Connect red and blue hoses to A/C and open valves.

2. Turn on power.

3. Press [

>] key two times.

4. Observe displays as shown to the left and enter data when

prompted.

5. Press [

#] key to move from one display to the next.

A/C HAS PRESSURE - GO TO RECYCLE (Note A)

This message will be displayed if there is still refrigerant in the
A/C. This refrigerant must be recycled before a deep vacuum
can be performed.

ENTER VACUUM TIME

Sets total time a vacuum will be drawn on the A/C.

PERFORM VACUUM LEAK TEST (Note B)

Yes - process will stop to allow checking for leaks. The display
will show total time since the vacuum pump shut off. A leak is
indicated if by an increasing pressure on the gauges.

CLOSE VALVES AND ADD OIL NOW (Note C)

Yes - process will stop so that oil can be added. Attach a filled
oil charge bottle to the oil charge port. When prompted, close
In/Out valves and open the valve on the bottle until the desired
amount of oil is drawn into the A/C. Go immediately to the
charge process.

Advertising