Wiring diagram – SnowEx SP-225 / US-200 User Manual
Page 13
© Trynex International 2009 L1188
GR4 — 13
SP-125 / SP-225 / US-100/ US-200 Wiring Instructions
Step 1: First, install switch at desired location.
Step 2: Run spreader/vehicle harness from the rear of vehicle to switch area. Attach the female spade red wire to the switch.
Leave the black wire for Step 5.
Step 3: Route the power harness from the battery to the switch/control.
Step 4: Attach the red lead to the positive side of the battery and the black lead to the negative side of the battery.
Step 5: Attach the female spade red wire on switch terminal. Using 3" double female black wire jumper attach the black
wire from the power harness to the black wire of the vehicle harness.
Step 6: Install rubber weatherproof boot on switch before finishing installation.
Step 7: Insert dielectric grease on terminals of SAE plug at rear of vehicle.
Wiring Diagram
Model #SP-125/SP-225/US-100/US-200
25
AMP
BATTERY
REMOVE JUMPER FOR USE
WITH VAR-020 VARIABLE
SPEED CONTROLLER KIT
DOUBLE FEMALE
3" JUMPER
Key Part No.
Description
Qty.
D 6184
On/Off Switch 1
D 6406
Rubber Switch Boot 1
D 6719
Wiring Harness 1
D 6425
Fuse Holder 1
D 6748
25 Amp Breaker 1
D 7105
3/8" Ring Terminal 2
IMPORTANT: In the off season remove control
and put in a cool dry place. The interior summer
temperatures could damage circuit board and
void warranty.