Assembly & installation (cont.), Thru-the-wall installation – SoleusAir SG-WAC-25ESE-C User Manual

Page 12

Advertising
background image

ASSEMBLY & INSTALLATION (CONT.)

Installing the Chassis into the Cabinet

1. Team lift (two people) the air conditioner chassis and

carefully slide it into the cabinet. Let the front of the air
conditioner hang out approximately 6”.

2.

CAUTION: DO NOT PUSH ON THE CONTROLS OR

FINNED COILS.

3. Be sure the chassis is firmly seated in the back of the

cabinet.

4. Insert all screws removed during window installation

and reattach the front face plate, front panel, and the
air filter. Use the REMOVE CHASSIS instructions and
figures 1-6 for reference.


THRU-THE-WALL INSTALLATION

NOTE: Consult local building codes prior to installation

and/or a qualified carpenter.

Select the Wall Location

This air conditioner has a slide-out chassis, so that it can
be installed through an outside wall as specified below:
MAX WALL THICKNESS: 8 1/4”

IMPORTANT: The side louvers must never be blocked.

NOTE: All parts needed for Thru-The-Wall Installation are

provided, except a wood frame, shims, and 10 wood
screws (10-1” long minimum). Select a wall surface that:
1. Does not support major structural loads such as the

frame construction at ends of windows, and under
truss-bearing points, etc.

2. Does not have plumbing or wiring inside.
3. Is near existing electrical outlets, or where another out-

let can or will be installed.

4. Does not have objects blocking the air vents which

limits cooling.

5. Allows unblocked airflow from the rear and sides of the

air conditioner.

Prepare the Wall

1. Prepare the wall in frame construction (including brick

and stucco veneer). Working from inside the room, find
the wall stud that is nearest the center of the installa-
tion area.

2. Cut a hole on each side of the center stud.
3. Measure between the inside edges of every other stud

as shown below.


FIG. 1

11

Advertising