BLOCK DIAGRAM

INSTALLATION
Connection with Feedback Shaft -
Attach to the position at which
the positioner feedback shaft and the rotary actuator main shaft are
almost concentric (range in which the spring pin of feedback shaft
edge enters the hole of fork assembly shaft edge).

Cam Attaching Procedure - Use the DA face of cam to turn the
actuator main shaft clockwise (viewed from the positioner front cover
side) at the time of input use the RA face to turn it counterclockwise
(reverse action). Correctly attach the cam to the flange part of
feedback shaft. Attach the cam in the procedure of loosening the
hexagonal nut with flange first, setting the using actuator to the
starting position and then setting the cam reference line and the
bearing contact point of span adjusting arm unit to the matching
position. DO NOT apply the supply pressure when attaching the cam
as otherwise it is very dangerous. When the positioner is shipped
out, the cam is tentatively tightened to the shaft. Be sure to firmly
lock the cam to the lock nut [tightening torque 2.0 to 2.5 Nm (20 to
25 kgfcm)].

ADJUSTMENT PROCEDURE
Zero Adjustment -
Set input signal to the Stroke starting signal (3
psi) then turn the zero adjuster clockwise or counterclockwise. In
case of spring actuator, check if it is set to standard pressure in zero
point. If not, repeat zero adjustment.

Span Adjustment - Turn and adjust span adjustment screw so that
indicator reaches at final stroke point by final input signal. Check
zero point and repeat zero span adjustment. 1/2 split range can be
used by zero and span adjustment. After setting, tighten up lock
screw of span adjustment.

Auto/Manual Switch - This is a switch for changing auto and
manual. Shipped products are set for auto. To use manual operation,
turn A/M switch counterclockwise. In manual operation, the pressure

of a Series AFR Air Filter Regulator connects to actuator. After using,
return switch to “A”. Not available for single acting - OUT2 and
double acting.
Seat Adjuster - No need to adjust in the field because seat adjuster
is to be adjusted before shipment for balanced pressure point of
output pressure. Seat adjuster is always used for double-acting. If
need to change balanced pressure point of output pressure, use
seat adjuster. If the sensitivity is poor because of the actuator type
of load condition, turn the seat adjuster screw clockwise. (The
amount of turning varies by actuators. Do not loosen the stopper
screw at this time since it is set to avoid the screw coming off.)

AIR PIPING CONDITIONS
Fully purge the pipe to remove foreign matter. Use a clean air supply
fully removed of humidity and dust. Use a Series AFR filter regulator
to keep supply air pressure constant. When using the double acting
type as the single acting type, blind either OUT1 or OUT2 and also
remove the pressure gauge to close its connection.

AIR PIPING DIAGRAM

MAINTENANCE
If the supply air is fouled, the positioner may not operate normally.
Periodically check the compressed air cleaning system and make
sure that clean air is always supplied. When disassembling the pilot
valve, coat grease to the O-ring of the sliding section. When the fixed
orifice is clogged with the carbon particles or others, remove the pilot
valve auto/manual changeover screw (built-in fixed aperture) and
clean it by inserting a 0.2 mm wire into the aperture. If it must be
replaced with a new one, stop the supply pressure and remove the
stopper screw of the pilot valve. Check the positioner once a year.
Treatment at an early stage is especially important if the positioner
is used in severe environments, like coastal areas.
In the unlikely event the 265NR Series Positioner should fail, the unit

can be returned to the factory for warranty repair if the warranty

period has not expired. Contact our customer service department for

a return goods authorization (RGA) number and to setup the return.
WARNING: Do not apply large vibration or impact to the positioner.

The positioner must be handled very carefully during transportation

and operation. If the positioner is used at temperatures outside of

the specification, the sealing materials deteriorate quickly and also

the positioner may not operate normally. Use clean supply air fully

removed of humidity and dust. Do not remove the terminal cover at

a dangerous position during power conduction. Be sure that the

terminal cover and body cover are installed during the operation. If

you leave the positioner at the operation site for a long time without

using it, put the cover on it so that rain water does not enter the

positioner. If the atmosphere is of high temperature or high humidity,

take measures to avoid condensation inside. The condensation

control measures must be taken thoroughly for export shipment.

PROXIMITY DIV., DWYER INSTRUMENTS, INC.

P.O. BOX 358 • MICHIGAN CITY, INDIANA 46360 U.S.A.

Phone: 219/879-8000

www.dwyer-inst.com

Fax: 219/872-9057

e-mail: [email protected]

©Copyright 2014 Dwyer Instruments, Inc.

Printed in U.S.A. 4/14

FR# RV-443333-30 Rev. 3

Advertising