Chapter 5: maintenance, 1 preventative maintenance schedule – Sterlco BP800 Series Granulators User Manual

Page 22

Advertising
background image

Chapter 5: Maintenance

22 of 41

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

Before carrying out any work on the granulator, carefully read the instructions provided in
this manual.

NOTE: Only specialist and competent personnel should carry out these operations.

All maintenance work must be carried out with the granulator switched OFF and with the
power supply disconnected and locked out.

Conduct that is not in accordance with safety instructions outlined in this manual may pose a
threat to both personnel and equipment.

Once the maintenance work in completed and before re-starting the granulator, make sure to
check the following:

ü

Any parts that may have been replaced and/or tools that have been used are removed

from the granulator.

ü

All safety equipment is in proper working condition.

Periodic Maintenance Schedule

Mechanical Check

Frequency

Knife clearance and wear

Weekly

Rotor knife retaining screws for tightness

Weekly

Downstroke bed knife and shield retaining screws for

tightness

Weekly

Upstroke bed knife retaining screws for tightness

Weekly

Screen cradle arm screws for tightness

Weekly

In-feed chute and cutting chamber screws for tightness

Monthy

NOTE: After the granulator has been used for the first day, adjust the drive belt
tension. Correct tension for use should be the minimum at which the belt does not slip.
Make sure the pulleys are correctly aligned.

Advertising