Chapter 2: server blade operations, Powering up the server blade, Chapter 2 – HP ProLiant BL20p G3 Server Blade User Manual

Page 23: Server blade operations, Powering up the server blade -1

Advertising
background image

2

Server Blade Operations

Powering Up the Server Blade

By default, server blades are set to power up automatically when installed in a server
blade enclosure. If you changed this setting, use one of the following methods to
power up the server blade:

Power button

— A momentary press initiates a power-up request. The system detects if power

is available from the power subsystem to power on the server blade. If power
is available, then the server blade powers on.

— A long press, 5 or more seconds, initiates a power-up override. The server

blade is powered on without detecting available power.

CAUTION: Always observe iLO alerts before initiating a power-up override to
prevent a hot-plug power supply fault and possible loss of system power. Refer
to the HP Integrated Lights-Out User Guide for more information.

NOTE: You may choose to perform a power-up override to power up a server blade and
to override the power-up request function when the management modules are not in use
and when you know that sufficient power is available.

Virtual power button features through the iLO remote console

— A momentary power-up selection

— A hold power-up selection

HP ProLiant BL20p Generation 3 Server Blade User Guide

2-1





Advertising