HP StorageWorks XP Remote Web Console Software User Manual
HP Storage
Advertising
This manual is related to the following products:
Table of contents
Document Outline
- Hitachi Universal Replicator for z/OS user guide for XP12000/XP10000 Disk Arrays and SVS 200
- About this Guide.
- 1 Overview of Universal Replicator for z
- 2 Overview of Universal Replicator Opera
- Functionality Overview
- Journal Copy
- Journal Restore
- URz Components
- XP Storage Systems
- Main and Remote Control Units
- Journal Group
- Data Volume Pair
- Journal Volume
- Remote Copy Connections
- Initiator Ports and RCU Target Ports
- URzRemoteConsole Software
- Host I/O Time-Stamping Function
- Error Reporting Communications (ERC)
- Remote Copy Operations
- Initial Copy Operations
- Update Copy Operation
- Journal Group Operations
- Read and Write I/O Operations
- Logical DKC (LDKC)
- Initiator Ports and RCU Target Ports
- Remote Copy Operations
- Initial Copy Operations
- Update Copy Operation
- Read and Write I/O Operations
- Journal Processing
- Creating and Storing Journals at the Primary Storage System
- Copying Journals to the Secondary Storage System
- Storing Journalatthe SecondaryStorage System
- Selecting and Restoring Journal at the Secondary Subsystem
- JournalGroup Operations
- Timer Type Option
- Journal Group Operations
- URz Delta Resync Operation
- URz Pair Status
- Business Continuity Manager Support
- Command Device
- 3PreparingforUniversalReplicator z/OS Operations
- System Requirements
- Requirements and Restrictions for URz
- Duplicate VOLSER (Volume Serial Number)
- Journal Group
- Accessing URz Primary Data Volume and Secondary Data Volume
- Installing the Hardware
- Enabling the URz Option(s)
- Planning of Journal Volumes
- Contributing Factors for Data Transfer Speed between Storage Systems
- Configuring the Primary and Secondary Storage Systems
- Using More Than One Primary and Secondary Storage System for Remote Console
- Basic Behavior
- Hardware Configuration (When More Than One Primary and Secondary Storage Systems are Used)
- Setup Procedure (When More Than One Primary and Secondary Subsystem are Used)
- Connections Among Secondary Storage Systems
- Disaster Recoveryfor Multiple Primaryand SecondaryStorage Systems
- Combining URz with Other Data Management Operations
- Combining URz with Virtual LVI
- Combining URz with Cache Residency Manager
- Combining URz and ShadowImage for z/OS
- Using At-Time Split Function When Combining URz with ShadowImage for z/OS
- Combining URz with TCz Synchronous (3DC Cascading Configuration)
- Combining URz with TCz Synchronous (3DC Multi-target Configuration)
- Changing to 3DC Multi-target Configuration after Recovering from Primary Site Failures
- Transferring Business Tasks from TCz Secondary Site to the Primary Site (in 3DC Cascading Configuration)
- Transferring Business Tasks from TCz Secondary Site to the Primary Site (in 3DC Multi-target Configuration)
- Transferring Business Tasks from TCz Secondary Site to the Primary Site (When Delta Resync Operation is Performed in 3DC multi-target configuration)
- Recovering from Failures in the Primary Site and the TCz Synchronous Secondary Site
- Transferring Business Tasks from the URz Secondary Site to the Primary Site
- 4Configuring Disk Storage Systems and Logical Paths
- DKC Operation Window
- Configuring Port Attributes
- Associating the Primary and the Remote Storage Systems and Configuring Logical Paths (Add DKC)
- Changing Options for Logical Paths and Storage Systems
- Adding Logical Paths
- Deleting Logical Paths
- Viewing the Status of Logical Paths
- Removing the Relationship Between the Primary and the SecondaryStorage Systems
- 5 Using Journal Groups
- Displaying the Journal Operation Window
- Registering Journal Volumes in a Journal Group
- Deleting Journal Volumes from a Journal Group
- Displaying Detailed Information about a Journal Group
- Changing Options for a Journal Group
- Deleting a Journal Group
- Splitting a Mirror (Suspending a copy operation)
- Restoring a Mirror (Resuming a copy operation)
- Deleting Data Volumes from a Mirror (Ending a copy operation)
- Forcibly Removing Journal Groups from an Extended Consistency Group
- 6 Performing URz Pair Operations
- Displaying the Pair Operation Window
- Creating a Pair of Data Volumes
- Displaying Detailed Information about a Pair of Data Volumes
- Changing Options for a Data Volume Pair
- Splitting a Pair of Data Volumes
- Restoring a Pair of Data Volumes
- Deleting a Pair of Data Volumes
- Creating a Point-in-Time Copy of Data Volumes
- 7 Monitoring Remote Copy Operations
- 8 Viewing History of Data Volume Pair Operations
- 9 Performing Optional Operations
- 10 Using Extended Consistency Groups
- 11 Disaster Recovery Operations
- 12 Troubleshooting
- 13 Power Management for Disk Storage Systems and Network Relay Devices
- 14 Pinned Track Recovery for URz Volumes
- 15 SIM Reporting
- 16 Acronyms and Abbreviations
- Index