Installation preparation, Determine installation height – GE PV970NSS User Manual
Page 13
49-80549-2
13
DETERMINE INSTALLATION HEIGHT
• Telescopic duct covers are provided to conceal
the ductwork running to the ceiling.
• This hood can be installed for recirculating
operation. Recirculating Kit included with hood.
NOTE: Installation height should be measured from
the cooking surface to the straight portion of the
hood.
The vent hood must be installed 24” min. and
µPD[DERYHWKHFRRNLQJVXUIDFH7KHKRRG
installation height, from the cooking surface to the
bottom of the hood, depends upon ceiling height
and duct cover limitations.
Installation Preparation
24” Min.
µ0D[
36” Min.
*Based on 36” countertop height
PV970, PV976
Upper
Duct
Cover
25.81
Lower Duct Cover
27.56
Counter to Hood Height
Actual
*Possible
Ceiling
*Possible
VENTED
RECIRCULATING
Height
Installation Height
Installation Height
7’11”
24” to 30”
24”
8’ 0”
24” to 30”
24” to 25”
8’ 1”
24” to 30”
24” to 26”
8’ 2”
24” to 30”
24” to 27”
8’3”
24” to 30”
24” to
28”
8’ 4”
24” to 30”
24” to 29”
8’ 5”
24” to 30”
24” to 30”
8’ 6”
24” to 30”
24” to 30”
8’ 7”
24” to 30”
24” to 30”
8’ 8”
24” to 30”
24” to 30”
8’ 9”
24” to 30”
24” to 30”
8’ 10”
24” to 30”
24” to 30”
8’ 11”
24” to 30”
24” to 30”
9’ 0”
24” to 30”
24” to 30”
9’ 1”
24” to 30”
24” to 30”
9’ 2”
25” to 30”
24” to 30”
9’ 3”
26” to 30”
24” to 30”
9’ 4”
27” to 30”
24” to 30”
9’ 5”
28” to 30”
24” to 30”
9’ 6”
29” to 30”
24” to 30”
9’ 7”
30”
25” to 30”
9’ 8”
26” to 30”
9’ 9”
27” to 30”
9’ 10”
28” to 30”
9’ 11”
29” to 30”
10’
0”
30”
10’ 1”
10’
2”
10’
3”