Getting started – Campbell Scientific RAWS-F Remote Automated Weather Station for Fire Weather User Manual

Page 11

Advertising
background image

RAWS-F Remote Automated Weather Station for Fire Weather

2. Getting Started

Set up and test your station before field deployment (Appendix A).

Level the RAWS to ensure the sensors are level. Level the rain gage by
adjusting the rain gage leveling screw. A post level and compass ship with the
station (pn 16670).

Keep this manual and the CR1000KD Keyboard Display with
the RAWS.

NOTE

Review the station siting and orientation section before field deployment. If a
problem is encountered, review the equipment wiring and troubleshooting
sections in this manual.

After siting and leveling the RAWS, open the enclosure and (1) connect the
battery cable and (2) verify the CH100 switch is in the ‘on’ position.

When this equipment is not in use (for example, transport or
storage), disconnect battery cable to the CH100.

NOTE

3

Advertising