Allstar Products Group ANSI/UL 325 User Manual
Page 2
2
W A R N I N G H I G H V O LTA G E
ONLY A QUALIFIED TECHNICIAN SHOULD SERVICE THIS GATE OPERATOR
PERIODICALLY TEST SENSITIVITY OF OVERLOAD
*** READ MANUAL ***
DATES
DATE TESTED
DATE TESTED
DATE TESTED
DATE TESTED
SERVICED
LOG DATE OVERLOAD TEST
Pre-Installation Notes................................................... 3
Operator
Class
Designation ................................... 3
Section A: Gate System Design/Installation ............. 4
Section B: Preparing the Site ..................................... 6
The
Concrete
Operator
Pad.................................... 6
Placing the Vehicle Detector Loops ..................... 6
Electrical Power Requirements.............................. 8
Section C: Installing the Operator ............................. 9
Placing the Mechanical Unit ................................. 10
Installing
the
Arm .................................................. 10
Installing the Control Box..................................... 11
Electrical
Hookup .................................................. 11
Schematic and Wiring Diagram............................ 11
Wiring the Mechanical Unit and Control Box...... 12
Bi-Parting
Wiring
Diagrams.................................. 13
Accessory
Equipment
Hookup .................. 13,15,16
READ THESE STATEMENTS CAREFULLY AND FOLLOW THE
INSTRUCTIONS CLOSELY.
The Warning and Caution boxes throughout this manual are there to protect you and
your equipment. Pay close attention to these boxes as you follow the manual.
WARNING
Indicates a MECHANICAL
hazard of INJURY OR
DEATH. Gives instructions
to avoid the hazard.
CAUTION
Indicates a MECHANICAL hazard
of DAMAGE to your gate, gate
operator, or equipment. Gives
instructions to avoid the hazard.
Indicates an ELECTRICAL
hazard of INJURY OR
DEATH. Gives instructions
to avoid the hazard.
WARNING
Indicates an ELECTRICAL hazard
of DAMAGE to your gate, gate
operator, or equipment. Gives
instructions to avoid the hazard.
CAUTION
TABLE OF CONTENTS
Pre-Setting the Motor Overload Sensitivity......... 17
Terminal Strip Reference Chart.....................17 - 19
Section D: Starting the Operator.............................. 19
Setting the Limit Switches .................................... 19
Setting the Switch Selectable Options ................ 19
No Load Test Mode................................................ 19
Applying
Power...................................................... 20
Indicator
Lamps ..................................................... 20
Maximum
Run
Timer.............................................. 22
Final
Settings ......................................................... 22
Section E: Auxiliary Equipment ............................... 23
Section F: End User Instructions ............................. 24
Safety Guide for the End User.............................. 24
Operational Guide for the End User..................... 25
Operator Exploded View & Parts List .............. 26 & 27
Technical Specifications............................................ 28
Figure 1: Test Log