Mountain Off Road JKDBT0709 User Manual

Page 2

Advertising
background image

Page 2




STEP 9:

Install the section of the OEM battery box which was cut off in step 7 using the original hardware

but DO NOT TIGHTEN. Install the new Power Distribution/PCM bracket over top of the OEM section you just
installed. Using the included 5/16” bolts & washers attach the Power Distribution/PCM bracket to the Dual Bat-
tery tray , DO NOT TIGHTEN. Now install the OEM Power Distribution/PCM mounting bracket start all the origi-
nal bolts and then tighten all the mounting bolts. ( see figure 11,12 & 13 )

STEP 10:

Reinstall the Power Distribution/PCM by reconnecting all the connectors and snap it back onto

the mounting bracket. ( see figure 14 ) Install both batteries into tray and retain using the hold down bracket and
“J” Bolts. Position Sensor over tab on bracket as shown in figure 15. Reconnect all connectors that were discon-
nected in Step 4. Reinstall Air filter box and Power Steering Res. In the original position. Reconnect batteries,
This can be done in many ways and we recommend having a electrical specialist do this for you. You can hook
up one of the batteries using the OEM cables so the Jeep is driveable if the need arises. Double check that you
have all connectors hooked up and that the heater hoses, etc. will not rub on anything sharp.

FIGURE 1

FIGURE 2

Advertising