4 engine operation, Starting procedure, Engine operation -7 – JLG 1500SJ Operator Manual User Manual
Page 73: Starting procedure -7
SECTION 4 - MACHINE OPERATION
3121261
– JLG Lift –
4-7
4.4
ENGINE OPERATION
NOTE:
Initial starting should always be per-
formed from the Ground Control sta-
tion.
Starting Procedure
IF ENGINE FAILS TO START PROMPTLY, DO NOT CRANK FOR AN EXTENDED TIME.
SHOULD ENGINE FAIL TO START AGAIN, ALLOW STARTER TO “COOL OFF” FOR 2-3 MIN-
UTES. IF ENGINE FAILS AFTER SEVERAL ATTEMPTS, REFER TO ENGINE MAINTENANCE
MANUAL.
NOTE:
After turning on ignition, operator must wait
until glow plug indicator light goes out
before cranking engine.
1.
Turn key of Platform/Ground Select switch to
the Ground position.
2.
Pull the Power/Emergency Stop switch out.
3.
Push the Engine Start switch until engine
starts.
ALLOW ENGINE TO WARM-UP FOR A FEW MINUTES AT LOW SPEED BEFORE APPLYING
ANY LOAD.
4.
After engine has had sufficient time to warm up, shut engine
off.
5.
Turn Platform/Ground Select switch to the
Platform position.