Daily walk-around inspection -6 – JLG 19BD Operator Manual User Manual
Page 24
Advertising
SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
2-6
– JLG Lift –
3121153
1. Base Frame
2. Manual Descent Control Valve
3. Motor/Pump/Reservoir Power Unit
4. Ground Controls
5. Mast Assembly
6. AC Junction Box Assembly
7. Platform Controls
8. Platform Control Foot Switches (option)
9. Platform Assembly
10. Hourmeter
Figure 2-1. Daily Walk-Around inspection.
(Shown with Standard Platform)
1
2
3
4
5
6
7
8
9
10
8
Advertising
This manual is related to the following products: