Daily walk-around inspection -6 – JLG 19BD Operator Manual User Manual

Page 24

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

2-6

– JLG Lift –

3121153

1. Base Frame
2. Manual Descent Control Valve
3. Motor/Pump/Reservoir Power Unit
4. Ground Controls
5. Mast Assembly
6. AC Junction Box Assembly
7. Platform Controls
8. Platform Control Foot Switches (option)
9. Platform Assembly

10. Hourmeter

Figure 2-1. Daily Walk-Around inspection.

(Shown with Standard Platform)

1

2

3

4

5

6

7

8

9

10

8

Advertising
This manual is related to the following products: