Ground control station, Ground control station -3 – JLG 1230ES Operator Manual User Manual
Page 31
Advertising

SECTION 3 - MACHINE CONTROLS AND INDICATORS
3121221
– JLG Lift –
3-3
Ground Control Station
DO NOT OPERATE FROM GROUND CONTROL STATION WITH PERSONNEL IN
THE PLATFORM EXCEPT IN AN EMERGENCY.
TO AVOID SERIOUS INJURY, DO NOT OPERATE MACHINE IF PLATFORM LIFT/
LOWER SWITCH DOES NOT RETURN TO THE OFF OR NEUTRAL POSITION
WHEN RELEASED.
PERFORM AS MANY PRE-OPERATIONAL CHECKS AND INSPECTIONS FROM
THE GROUND CONTROL STATION AS POSSIBLE.
NOTICE
WHEN THE MACHINE IS SHUT DOWN FOR OVERNIGHT PARKING OR BATTERY
CHARGING, THE EMERGENCY STOP AND POWER SELECT SWITCHES MUST BE
POSITIONED TO OFF TO PREVENT DRAINING THE BATTERIES.
Figure 3-2. Ground Control Station
1. Ground Controls
2. Battery Charging - Status Indicators and Circuit Breaker
3. Hour Meter
000000
1
2
3
Advertising