2 platform tool tray - installation, 3 mast cover plate - installation, 4 platform ac receptacle box - installation – JLG 1230ES Service Manual User Manual
Page 102: 4 platform ac receptacle box - installation -2
Advertising
SECTION 6 - MAST COMPONENTS
6-2
– JLG Lift –
3121222
6.2 PLATFORM TOOL TRAY - INSTALLATION
6.3 MAST COVER PLATE - INSTALLATION
6.4 PLATFORM AC RECEPTACLE BOX -
INSTALLATION
Platform Tool Tray - Installation
1. Tool Tray
2. Attach Screws (a)
Note: (a) Do not use a screw with the threaded portion longer
than 1/2 in. (12mm) when attaching to the side of the
mast.
Mast Cover Plate Installation
1. Mast Cover Plate
2. Rivet Nuts
3. Top of Mast Assembly
AC Receptacle Box - Installation
1. AC Voltage - Receptacle
Box Components
2. Attach Screws
3. Platform/Mast Assembly
Note: (See AC POWER RECEPTACLES AND WIRING (PLAT-
FORM) - CE SPEC MACHINES ONLY on page 9-38) for
receptacle wiring connections of available AC plug types.
Advertising