Carbolite HTR 11/150 User Manual

Installation, operation & maintenance instructions

Advertising
background image

MF30 – 3.06


Installation, Operation &

Maintenance Instructions

1100°C Rotary Reactors

HTR 11/75 & HTR 11/150




This manual is for the guidance of operators of the above Carbolite products

and should be read before the furnace is connected to the electricity supply.

Manuals are supplied separately for the furnace controller

(and overtemperature controller when fitted).

Please read the controller manuals before operating the furnace.

C

ONTENTS

Section

page

1.0

Symbols & Warnings

2

2.0

Installation

3

3.0

Operation

5

4.0

Maintenance

7

5.0

Repairs & Replacements

8

6.0

Fault Analysis

10

7.0

Circuit Diagrams

11

8.0

Fuses & Power Settings

14

9.0

Specifications

16

Advertising
This manual is related to the following products: