Unloading & assembly – MacDon 974 FlexDraper User Manual

Page 92

Advertising
background image

Form # 147083

Issue 01/07

90

• 0 GAP FOR CUTTING ABOVE GROUND
• ALIGN FLOAT ARM WITH NOTCH FOR

CUTTING ON GROUND (1/2 “ GAP)

D

A

UNLOADING & ASSEMBLY


974 FLEX HEADER: WING FLOAT SET-UP AND PRE-DELIVERY CHECK

11. Reduce adapter float spring setting for field.

a) For cutting on the ground:
• Leave float gap at 1/2” (13 mm), aligning float

arm with notch (D). This setting should
require about 30 pounds (135 N) to raise right
or left divider.

• Unlock wing float prior to operation.

b) For cutting off the ground:
• Lock wing float.
• Set header 6” (150 mm) above ground.
• Reduce float (loosen float spring adjusting

bolts) until right and left float arms are in
contact with down stops at (A).

• Check float at divider point. It should require

about 50 pounds (225 N) to raise right or left
divider. Readjust float springs as required.
See Adapter Operator’s Manual for
adjustment procedure.

Advertising
This manual is related to the following products: