Maintenance and lubrication schedule – Braun Millennium Series 05 User Manual

Page 16

Advertising
background image

Page 14

Inspect lift for wear, damage or any abnormal
condition

Inspect lift for rattles

Correct as needed.

Correct as needed.

Platform pivot pin bearings (2)

Platform fold axles (2)

Inner roll stop (IB) lever bearings (2)

Inner roll stop (IB) lever slot (2)

Rotating pivot slide arm pivot pins (2)

Parallel arm pivot bearings (16)

Handrail pivot pin bearings (4)

Hydraulic cylinder bushings (8)

Inspect Lift-Tite

latch rollers for wear or damage,

positive securement and proper operation (2)

Inspect inner roll stop (IB) for:
• Wear or damage
• Proper operation. Rollstop should just rest on top

surface of the base plate.

• Positive securement (both ends)

Inspect handrail components for wear or damage,
and for proper operation

Inspect microswitches for securement and proper
adjustment.

Make sure lift operates smoothly

Inspect external snap rings:
• Handrail pivot pins (2 per pin)
• Platform slide/rotate pivot pins (2 per pin)
• Platform fold axles (1 per axle)
• Inner roll stop (IB) lever bracket pins (1 per pin)
• Lift-Tite

latch gas (dampening) spring (2 per

spring)

Inspect platform fold axles and bearings for wear or
damage and positive securement

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Correct, replace defective parts and/or relubricate.

Resecure, replace or correct as needed. See
Platform Angle Instructions and Microswitch Ad-
justment Instructions.

Replace defective parts.

Resecure, replace or adjust as needed. See
Microswitch Adjustment Instructions.

Realign towers and vertical arms. Lubricate or
correct as needed.

Resecure or replace if needed.

Replace defective parts and resecure as needed.
Apply Light Oil.

Perform all procedures listed in previous section also

750

Cycles

1500

Cycles

Maintenance and Lubrication Schedule

Advertising