4 installing the flow-through cell, Installing the flow-through cell, Figure 4 – Metrohm 944 Professional UV/VIS Detector Vario User Manual
Page 23: Cell block
Advertising

■■■■■■■■■■■■■■■■■■■■■■
3 Installation
944 Professional UV/VIS Detector Vario (2.944.0010)
■■■■■■■■
15
A longer section of silicone tubing (6.1816.020) may have to be cut
to size and mounted (see also the manual for the IC instrument).
5 If one of the instruments in the stack is equipped with a leak sensor
connection socket, connect the leak sensor (see manual of the IC
instrument).
6 Restore any capillary connections that may have been removed.
3.4
Installing the flow-through cell
1
2
3
3
4
Figure 4
Cell block
1
Cell holder
Holder for the flow-through cell.
2
Cover plate
Protects the cell holder form contamination
if no cell is installed.
3
Knurled screws
4
Cylinder screw
For the correct alignment of the flow-
through cell.
Advertising