WV410 WINDOW - INSTALLATION INSTRUCTIONS

Section VIII – Window Installation

B. Dual Window Installation

The procedure for installing the vertical mullion in a dual window application differs from the

ribbon run application. In a dual window application, the WV410 frame side clearances are ample
enough to install the windows after the vertical mullion. In a dual window application the mullion

is always installed first.

Step 1

Establish the mullion center lines in the opening per the approved shop drawings. Refer to the

elevation in Figure 13 to locate the mullion center.

Step 2

Cut the vertical mullion halves 1F10/9837 to the daylight opening height and prep the ends as

detailed in Figure 14 below.

* Drawings on this page are not to scale.