901/902 drilling template, 903/904 in, B) drilling t – EFCO 904 Series User Manual

Page 13: Verticals, Butt glazed, Jambs 2 pc. captured verticals

Advertising
background image

HORIZONTAL

.590

VERTICALS

1.625

BUTT GLAZED

TOP OF

7253

7028

JDA 10/2001

OR 8593

SECTION III A - FABRICATION

DRILLING TEMPLATE - 901/902 INTERMEDIATE HORIZONTAL

5/8" NOTCH

AT VERTICALS

8499

AT JAMB

1" NOTCH

1.000

FRONT OF MULLION

FRONT OF MULLION

901/902 SYSTEMS

903/904 SYSTEMS

1/2" F.H.

#10-24x

(S110)

8583

1.625

.590

NOTE: OFFSET

.062

8594

TOP OF

HORIZONTAL

9578

.312

.750

(9470)

K176

.149 DIA. (#25 DRILL)
FOR #10-24 x 1 3/4" P.H.S.M.S.
(3) MRF8

OR 9579

9576

JAMBS

2 PC.

CAPTURED
VERTICALS

PAGE 11

.625

Advertising
This manual is related to the following products: