08_reliance – Oldcastle BuildingEnvelope Solar Eclipse User Manual

Page 8

Advertising
background image

8






S U N C O N T R O L - I N S T A L L A T I O N M A N U A L

SOLAR ECLIPSE

WW-107-01

WW-162-02

Install WW-107-01 anchor with

(4) 3/8"-16" 7/8" S.S. button

socket head bolts. Prior to

installing glass.

FIGURE 7

Reliance Assembly

3/8" hex jamb nuts

& washers

FS-325

(#12 x 1

1

2

" hwh

drill-flex)

1.2 Assembly

10) Hardware required for attachment of standard anchor (WW-107-01) will be contained in the

hardware package, (part. no. 12854). This package contains (1) one WW-162-02 cover plate,

(4) four 3/8"- 16 x 7/8" stainless steel button socket head bolts, nuts and washers and (4) four

3/8"-16 x1-1/4" stainless steel hex head bolts, nuts and washers. (Size and quantity of bolts

may vary based on project requirements, consult engineer for specific job applications).

11) Attach anchor to mullion by first inserting anchor into cutout in face of mullion tongue. Attach

anchor using the 3/8"-16 x 7/8" S.S. button socket head bolts, washers and securing using
the 3/8"-16 S.S. jamb nuts. Repeat for each of the 4 bolts. See

FIGURE 7

(Size and

quantity of bolts may vary based on project requirements, consult engineer for specific job

applications).

12) Once system is glazed. Install section of GP-103 gasket onto WW-162-02 cover plate and

install plate over anchor attaching to mullion using (2) two FS-325 (#12-14 x 1-1/2" HWH

Drill-Flex fasteners).

Note: Due to reduced clearance for attachment of anchors, special care must be taken when

installing glass.

Notes:

1) Assembly package part no. 12854 required.

2) Anchor must be installed prior to glazing.

3) Glass clearance at anchor is reduced to 3/16",

of glass.

Advertising