B&C Technologies IM Series Industrial Ironer User Manual
Page 101
Etanorm SYA
2
Contents
Page
1
General
4
2
Safety
4
2.1
Marking of Instructions in the Manual
4
2.2
Personnel Qualification and Training
4
2.3
Non-compliance with Safety Instructions
4
2.4
Safety Awareness
4
2.5
Safety Instructions for the Operator / User
4
2.6
Safety Instructions for Maintenance, Inspection
and Installation Work
4
2.7
Unauthorized Modification and Manufacture
of Spare Parts
5
2.8
Unauthorized Modes of Operation
5
3
Transport and Interim Storage
5
3.1
Transport
5
3.2
Interim Storage / Preservation
5
4
Description of the Product and Accessories
5
4.1
Technical Specification
5
4.2
Designation
5
4.3
Design Details
5
4.4
Permissible Forces and Moments at the Pump
Nozzles
6
4.5
Noise Characteristics
6
4.6
Accessories
6
5
Installation at Site
7
5.1
Safety Regulations
7
5.2
Checks to Be Carried out Prior to Installation
7
5.3
Installing the Pump / Unit
7
5.3.1
Aligning the Pump/Drive
7
5.3.2
Place of Installation
8
5.4
Connecting the Piping
8
5.4.1
Auxiliary Connections
9
5.5
Final Check
9
5.6
Contact Guard
9
5.7
Connection to Power Supply
9
5.7.1
Connecting the Motor
9
5.7.2
Setting the Time Relay
9
5.7.3
Checking the Direction of Rotation
9
6
Commissioning, Start-up / Shutdown
9
6.1
Commissioning
9
6.1.1
Lubricants
9
6.1.2
Shaft Seal
9
6.1.3
Priming the Pump and Checks to be Carried out
9
6.1.4
Start-up
10
6.1.5
Shutdown
10
6.2
Operating Limits
10
6.2.1
Temperature of Medium Handled
10
6.2.2
Switching Frequency
10
6.2.3
Minimum Flow
10
6.2.4
Minimum Permissible Speeds
10
6.2.5
Density of the Medium Handled
10
6.3
Shutdown / Storage / Preservation
10
6.3.1
Storage of New Pumps
10
6.3.2
Measures to Be Taken for Prolonged Shutdown
10
6.4
Returning to Service after Storage
10
Page
7
Maintenance / Repair
11
7.1
General Instructions
11
7.2
Maintenance / Inspection
11
7.2.1
Supervision of Operation
11
7.2.2
Lubrication and Lubricant Change
11
7.3
Drainage / Disposal
11
7.4
Dismantling
12
7.4.1
Fundamental Instructions and Recommendations 12
7.4.2
Preparations for Dismantling
12
7.4.3
Pump
12
7.4.4
Mechanical Seal
12
7.5
Reassembly
12
7.5.1
Pump
12
7.5.2
Mechanical Seal
13
7.5.3
Tightening Torques
14
7.6
Spare Parts Stock
15
7.6.1
Interchangeability of Pump Components
15
7.6.2
Ordering Spare Parts
16
7.6.3
Recommended Spare Parts Stock for 2 Years’
Operation
16
8
Trouble-shooting
17
9
Related Documents
18
9.1
General Drawing and List of Components
Etanorm SYA, SU 25
18
9.2
Exploded View and List of Components
Etanorm SYA, SU 25
19
9.3
General Drawing and List of Components
Etanorm SYA, SU 35, 55
20
9.4
Exploded View and List of Components
Etanorm SYA, SU 35, 55
21
91