California Faucets 1/2" Pressure Balance Valve Tirim User Manual

Page 3

Advertising
background image

TO-PBL-XX_ii_110112.doc

Pg

3

2

2

½”

1

/

32

3

INSTALL TRIM


Important:
Prior to performing the next steps, the

finished wall surface MUST be completed

• Attach BUSHING (10) onto CARTRIDGE NUT

(9)

• Place SHOWERPLATE (11) onto BUSHING (10)

• Tighten ESCUTCHEON (12) or (12a) onto

BUSHING (10) until SHOWERPLATE (11) is

secure to finished wall surface. An additional

BONNET (12b) may be supplied based on product

style, this BONNET (12b) shall be attached to
ESCUTCHEON (12a) prior to affixing HANDLE

(13)

• Trim STEM (15) to allow ½” of STEM (15) to

protruded out from ESCUTCHEON (12)

• Place HANDLE (13) onto STEM (15)
• Allow for

1

/

32

” (thickness of credit card) of gap

between ESCUTCHEON (12) and HANDLE (13)

• Tighten SETSCREW (14) to secure HANDLE (13)

onto STEM (15)

NOTE: Trim extension kits available for extra thick

finished wall and/or valve positioned too deep into wall








MAINTENANCE

• For detailed maintenance of the valve components:

See PB-R ½” Pressure Balance Valve Rough

Installation Instructions

IMPORTANT: After performing any maintenance procedures, it is
necessary to verify TEMPERATURE SETTINGS

• See .

1

. TEMPERATURE SETTING

• See .

2

. INSTALL TRIM

Advertising