Procedure for lubricating flange bearings, Procedure for attaching a vacuum – EDCO 4GC-P User Manual
Page 13

Printed in USA
TVW
©2012
Page 13
E-SEC,2EC,2GC-P,4GC-I-0512
100 Thomas Johnson Drive, Frederick, MD 21702-4600 USA
Phone (301) 663-1600 • 1-800-638-3326
Fax (301) 663-1607 • 1-800-447-3326
Website: www.contrxsystems.com
Email: [email protected]
PROCEDURE FOR LUBRICATING FLANGE BEARINGS
To grease the fl ange bearings attach the grease gun to the grease fi ttings and give only two (2) pumps on the grease gun
every 50 hours of use. If excessive over lubrication is done grease will leak onto the work surface causing possible dam-
age and wasted cleanup time.
If using a vacuum for dust control attach it to the vacuum port at the rear of the machine except for the SEC and 4GC
which is on the handle as pictured above, securing it with clamps. The ports are shown in the photos above.
PROCEDURE FOR ATTACHING A VACUUM
The procedure is the same for two or four disc machines. The hood has to be removed to access the grease points on the
fl ange bearings. The single disc grinder is lubricated through the access hole on the front of the machine and under the belt
cover. The grease points are circled in the photos above. There are duplicate grease fi ttings on the underside of the 2EC,
2GC and the 4GC models. The skirts will have to be removed to access the grease points.
SEC
2GC
4GC
Inspection
hole
Inspection
hole
Gear
case
Gear
case
Vac
Port
Multi-Vac
Port
Multi-Vac
Port
hidden