Troubleshooting guide – Reznor VPS Unit Installation Manual User Manual

Page 38

Advertising
background image

38

6. Troubleshooting Guide.

START

Ensure gas & electricity

supplies are enabled.

Turn any external timer

to call for heat (if fitted).

Does the Power On

light illuminate?

NO

YES

Set thermostat to call for
heat at maximum setting

NO

YES

CHECK: -
1. Operation of any timer or control.
2. External fuses.
3. Supply Voltage is 120VAC 60Hz

Is there power to the

burner?

CHECK: -
1. Transformer
2. Integrity of wiring connections.
3. Light.

Does the fan run?

NO

YES

CHECK: -
1. Voltage supply to fan terminal 120VAC 60Hz
2. Integrity of wiring connections.
3. Fan.

Do the amber

lights illuminate after a

purge period?

NO

Is there power to

the fan?

YES

NO

CHECK: -
1. Integrity of wiring connections.
2. Pressure switch operation.
3. Ignition controller.
4. Transformer.

Does the Pressure

switch close?

YES

NO

CHECK: -
1. Pressure switch wiring connections.
4. Integrity of wiring connections.
5. Amber lights.
6. Ignition controller.
5. Transformer

CHECK: -
1. Hose connection to Pressure switch.
2. Air inlet, outlet, and emitter tubes for obstructions.
3. Pressure switch operation.
4. Supply voltage 120VAC / 60Hz
5. Transformer.
6. Ignition Controller.

YES

Advertising