NEMO Equipment MOK User Manual

Moki, Overview set up, Take down

Advertising
background image

*Patents Pending

©2007 NEMO Equipment, Inc.

MOKI

OVERVIEW

SET UP

To take down Moki™, first empty tent, remove accessories (including

the vestibule, Pawprint™, and Cheez™ insulation), and shake out

moisture and debris. Water will add weight to your pack and can lead to

mildew.

1

Unclip and remove the exterior poles. Carefully pull the interior poles

out through the main door. If the pole wraps bind to the interior poles,

it may be necessary to detach them before removing the poles.

2

Try to clean as much dirt and debris from your tent as possible before

packing it. This will help preserve the breathability of the tent fabrics

and reduce overall wear and tear.

3

Stuff the tent shell into its dry bag style stuff sack. Fold the top edge of

the stuff sack down several times to make an airtight seal. Allow excess

air to escape while compressing. Secure the stuff sack with the

compression straps on both sides. Place the poles into the pole bag.

See features section for more about modular packing of Moki™.

4

Remember to leave no trace even in winter. Before leaving your

campsite take a thorough look around making sure you have not left

anything behind, out of place, or damaged.

5

TAKE DOWN

1

2

3

6

4

1. Internal Poles

2. Zipper for Vestibule Attachment

3. External Poles

4. PU Weather Window

5. Internally Deployable Strutted Vents

6. Side Door

7. 2nd Main Door

8. Pole Sleeves

9. Multiple Guy-out Points

10. Reinforced Corner Pockets

11. Door Tie-backs

12. PU Weather Checking Window

13. Zip-on Vestibule

14. Upper Vestibule Panel

15. Connection Panel

16. Cheez™ Insulation (Sold Separately)

www.nemoequipment.com

NEMO EQUIPMENT INC.

100 Factory Street, Nashua, NH 03060

Phone: 1-800-997-9301

E-mail: [email protected]

Lay out the contents of Moki™ and make sure that you received your

tent and the following: 4 long poles, one short pole, curved vestibule

pole, vestibule, upper vestibule panel, connection panel with red Velcro,

pole stuff sack, dry bag style stuff sack, 10 stakes, guy lines, Seamgrip®

with nozzle, Tear-aid™ fabric repair patchs and pole repair sleeve.

Seam sealing adds strength and waterproofness to tent. It needs at least

24 hours to cure before using. See insert with included Seamgrip®.

Begin the setup of your tent by staking it out on level ground. Insert one

end of a black pole through pole sleeve and into grommet on red

webbing. Place other end of pole through opposite pole sleeve and into

grommet on red webbing. Repeat with second pole in the grommets on

black webbing. Clip tent to poles.

Zip the upper vestibule panel to the vestibule and to the tent. Slide the

vestibule pole through the sleeve. Attach pole to grommets in tent

anchors. Then attach vestibule grommets to pole ends and tighten

webbing to hold vestibule in place. Stake out the vestibule front corners.

Vestibule and Cheez™

Moki™

4

2

1

6

6

5

4

4

3

4

5

6

7

10

11

2

9

1

16

14

12

13

The corners of Moki™ are reinforced to receive the ends of the orange

interior poles. Place pole ends in button snaps at corners. Use the Velcro

wraps to secure the poles along the inside of the tent shell.

5

Insert short pole into grommets on webbing between top vents. Use

finger loops to help get the pole in and out.

3

4

15

8

8

Advertising
Table of contents