Connection diagram, Sw32ps-rcp port switcher controller – DNF Controls SW32PS-RCP User Manual

Page 8

Advertising
background image


Use the table below to set the switches for the desired ID:

SW6 SW5 SW4 SW3 SW2 SW1

ID: 01

Left Left Left Left Left Right

ID: 02

Left Left Left Left Right

Left

ID: 03

Left Left Left Left Right

Right

ID: 04

Left Left Left Right

Left Left

ID: 05

Left Left Left Right

Left Right

ID: 06

Left Left Left Right

Right

Left

ID: 07

Left Left Left Right

Right

Right

ID: 08

Left Left Right

Left Left Left

ID: 09

Left Left Right

Left Left Right

ID: 010 Left Left Right

Left Right

Left

c.

Connect DB9F side of supplied power supply into the connector labeled
“Power”. Then connect the IEC to Edison cable to the power supply.

Connect the power cable to 90 VAC to 240 VAC source.

Caution: Do Not Hot Plug the Power Supply DB9F connector!
Installation is complete.

4. CONNECTION DIAGRAM


TYPICAL CONNECTION DIAGRAM


Page

4

4

O

O

f

f

1

1

3

3

SW32PS-RCP Port Switcher Controller

Advertising