Rh2 pre-start up checklist – Nortec RH2+ User Manual

Page 31

Advertising
background image

Start Up | 28

RH2 Pre-Start Up Checklist

Unit Serial #: _________________ No. of humidifiers: _______ Tag: _______________
Unit type: _______ __________

Voltage: ________V/_____ph

Cylinder type:

Customer/Job:

Address:

WATER QUALITY:

Well water  City water  Softened water 

HUMIDIFIER MOUNTING:

Level

• Front Clearance 36 in. 

STEAM LINE(S):

Material 

• Diameter / Size

Slope up (min 2 in/ft) 

• Slope down (min 0.500 in/ft) 

Low point condensate traps 

• No hose kinks / Restrictions 

Minimum 1 inch insulation 

CONDENSATE LINE(S):

P Trap min 6 in or duct press + 2in 

• P Trap min 12 in drop 

WATER LINE:

1/2 in to within 4ft of unit 

• Water pressure: 30-80 psig 

Cold water source (34-68ºF/1-20ºC) 

DRAIN LINE:

Air gap within 3 ft of the unit 

• Diameter / Size

CYLINDER:

Seated in drain valve

yes  no 

Torque for gear clamp of cylinder steam exit to steam line (max 12 in•lbs): ______________

WIRING:

Wiring connections and connectors secured

yes  no 

CONTROLS:

On / Off / Security loop devices working correctly

yes  no 

Jumper J10 set to

Modulating (removed) 
Or
On/Off (installed) 

Control Location

High Limit Location

POWER:

Voltage, amp, fuse per Spec Label:

yes  no 

Disconnect switch located close to humidifier

yes  no 

Panel Number


Inspected by:

Date of inspection: ______/_______/______


Company:

Advertising