CAUTION: Make sure exter-

nal regulator has been installed

between propane/LP supply

and heater. See guidelines un-

der Connecting to Gas Supply,

page 13.

PRESSURE TESTING GAS SUPPLY
PIPING SYSTEM
Test Pressures In Excess Of 1/2 PSIG
(3.5 kPa)
1. Disconnect appliance with its appliance main gas

valve (control valve) and equipment shutoff valve

from gas supply piping system. Pressures in excess

of 1/2 psig will damage heater regulator.

2. Cap off open end of gas pipe where equipment

shutoff valve was connected.

3. Pressurize supply piping system by either

opening propane/LP supply tank valve for

propane/LP gas or opening main gas valve

located on or near gas meter for natural gas

or using compressed air.

4. Check all joints of gas supply piping system.

Apply noncorrosive leak detection fluid to all

joints. Bubbles forming show a leak.

5. Correct all leaks at once.
6. Reconnect heater and equipment shutoff

valve to gas supply. Check reconnected fit-

tings for leaks.

Test Pressures Equal To or Less Than
1/2 PSIG (3.5 kPa)
1. Close equipment shutoff valve (see Figure 15).
2. Pressurize supply piping system by either

opening propane/LP supply tank valve for

propane/LP gas or opening main gas valve

located on or near gas meter for natural gas

or using compressed air.

3. Check all joints from gas meter to equipment

shutoff valve for natural gas or propane/LP sup-

ply to equipment shutoff valve for propane/LP

(see Figures 16 and 17, page 15). Apply noncor-

rosive leak detection fluid to all joints. Bubbles

forming show a leak.

4. Correct all leaks at once.

CAUTION: Avoid damage to

regulator. Hold gas regulator

with wrench when connecting it

to gas piping and/or fittings.

INSTALLATION

Continued

Tee Pipe Cap
Joint Nipple

PROPANE/LP
From External
Regulator (11" W.C.**
to 14" W.C. Pressure)
NATURAL
From Gas Meter
(5" W.C.** to
10.5" W.C.
Pressure)

Sediment Trap

3" Minimum

CSA Design-Certified
Equipment Shutoff Valve
With 1/8" NPT Tap*

Approved Flexible
Gas Hose (if allowed
by local codes)

Gas
Regulator

Figure 14 - Gas Connection

* Purchase the optional CSA design-certified

equipment shutoff valve from your dealer. See

Accessories

, page 27.

** Minimum inlet pressure for purpose of input

adjustment.

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping

and connections, internal and

external to unit, for leaks after

installing or servicing. Correct

all leaks at once.

WARNING: Never use an open

flame to check for a leak. Apply

a noncorrosive leak detection

fluid to all joints. Bubbles form-

ing show a leak. Correct all leaks

at once.

Figure 15 - Equipment Shutoff Valve