MCZ Swing HYDRO User Manual

Page 27

Advertising
background image

DX2

f

f

25

4-INSTALLATION AND ASSEMBLY

Technical Dept. - All rights reserved - Reproduction is prohibited

INTERMEDIATE SIDE PANEL

Take the ceramic part marked with code DX2 and insert it into the lower hooks already fixed to the bottom ceramic part.

Insert the upper hooks and tighten the screws. Fix the two felt pads (pos.f) on the upper profile of the intermediate ceramic part.

INTERMEDIATE SIDE CERAMIC PART POSITIONING

Advertising