PLANET VC-810S User Manual

Page 17

Advertising
background image

User’s Manual of VC-810S / VC-810S48

17

Connect the fiber cable

1. Attach the duplex LC connector on the network cable into the SFP transceiver.

2. Connect the other end of the cable to a device – switches with SFP installed, fiber NIC on a workstation or a Media

Converter..

3. Check the LNK/ACT LED of the SFP slot on the front of the VDSL2 Switch. Ensure that the SFP transceiver is

operating correctly.

4. Check the Link mode of the SFP port if the link failed. Co works with some fiber-NICs or Media Converters, set the

Link mode to “1000 Force” is needed.

There is a known SFP operation issue, please insert the transceiver into the SFP slot first.

Then connect the fiber cable, or the Fiber link might be failed.

Remove the transceiver module

1. Make sure there is no network activity by consult or check with the network administrator. Or through the

management interface of the switch/converter (if available) to disable the port in advance.

2. Remove the Fiber Optic Cable gently.

3. Turn the handle of the MGB/MFB module to horizontal.

4. Pull out the module gently through the handle.

Figure 2-9 Pull out the SFP transceiver

Never pull out the module without pull the handle or the push bolts on the module. Direct pull

out the module with violent could damage the module and SFP module slot of the VDSL2

Switch.

Advertising
This manual is related to the following products: