Test timing, Test timing 69 – HP OMNIBER 718 HP 37718A User Manual
Page 79

69
Making Measurements
Test Timing
Test Timing
Description
There are two aspects to test timing:
•
Error results may be displayed as short term or cumulative over the
measurement period.If short term error measurements are required,
the short term period may be selected.
•
The period of the test may be defined or controlled manually.
HOW TO:
1
Choose
on the
display.
2
Choose the SHORT TERM PERIOD to the timing required for short
term results.
3
Choose the type of TEST TIMING required:
For manual control with
choose
.
For a single timed measurement period started with
,
choose
and choose the Test duration.
For a timed period starting at a specified time, choose
, choose
the Test duration and the test START date and time.
TIMING CONTROL
RESULTS
RUN/STOP
MANUAL
RUN/STOP
SINGLE
TIMED