Venting, Minimum flue vent configuration, 8 installing through the ceiling – Harman Stove Company Harman Pellet P43 User Manual

Page 14

Advertising
background image

14

P43 Pellet Stove

3-90-04301R18_03/13

Minimum flue vent

configuration

It is required that outside air

be installed with this venting

configuration to reduce smoke

and creosote smell in the room

in the event of power failure.

Min. above ground level

18"

venting

Fig. 15

Fig. 14

PL vent manufacturer's

firestop spacer and

support

(See Page 7 for

corner installation

clearances)

Storm collar

Flashing

3" min.

3" min.

12" min.

3" min.

3" min.

No insulation or

other combustible

materials are

allowed within

3" of the pellet

vent pipe. Unless

specified by the

pipe manufacturer

Fig. 16

12" min. wall to outlet

36" min clearance to any

combustible material

Shaded area represents the

minimum clearance to combustible

materials such as shrubbery, mulch

or tall grasses.

#8 installing through the ceiling

Through the ceiling vent, follow PLvent manufacturers

recommendations when using wall and ceiling pass

through.
note: do not place joints within wall pass-throughs.

Advertising