6 cluster setup, Introduction, Preliminary operations – HP VA 7400 User Manual
Page 41: Cluster setup
VA 7100/7400 Cluster Installation Guide
10/12/01
38
6 Cluster
Setup
Introduction
This chapter provides detailed instructions for performing the cluster setup.
Preliminary Operations
The following preliminary operations must be successfully completed before beginning the
1. Ensure that all requirements detailed in chapters 2 through 5 have been thoroughly reviewed and successfully
completed.
2. Ensure that storage array is powered up and maintained in accordance with the procedure of chapter 3.
3. Ensure that node 1 is powered up and running.
4. Ensure that node 2 is powered up but in Pause mode. Refer to step
of the
chapter 5.
5. Ensure that the cluster Configuration Worksheet located in Appendix A has been completely filled out.
6. On the node 1 Windows 2000 Configure Your Server window shown below, click Finish setup.