6 cluster setup, Introduction, Preliminary operations – HP VA 7400 User Manual

Page 41: Cluster setup

Advertising
background image

VA 7100/7400 Cluster Installation Guide

10/12/01

38

6 Cluster

Setup

Introduction

This chapter provides detailed instructions for performing the cluster setup.

Preliminary Operations

The following preliminary operations must be successfully completed before beginning the

Cluster Setup Procedure

.

1. Ensure that all requirements detailed in chapters 2 through 5 have been thoroughly reviewed and successfully

completed.

2. Ensure that storage array is powered up and maintained in accordance with the procedure of chapter 3.

3. Ensure that node 1 is powered up and running.

4. Ensure that node 2 is powered up but in Pause mode. Refer to step

16

of the

Configuration Procedure

of

chapter 5.

5. Ensure that the cluster Configuration Worksheet located in Appendix A has been completely filled out.

6. On the node 1 Windows 2000 Configure Your Server window shown below, click Finish setup.

Advertising