Installation, Precautions, Preparing to install the hardware – HP R2200 User Manual

Page 12: Required tools

Advertising
background image

Installation 12

Installation

In this section

Precautions............................................................................................................................................ 12

Preparing to install the hardware ............................................................................................................. 12
Installing the UPS as a tower.................................................................................................................... 13

Installing the UPS in a rack...................................................................................................................... 18

Installing the ERM as a tower................................................................................................................... 27

Installing the ERM in a rack ..................................................................................................................... 31

Precautions

Save these instructions. This document contains important safety instructions that should be followed

during installation, operation, and maintenance of the UPS and batteries.

WARNING: A risk of personal injury from electric shock and hazardous energy levels

exists. The installation of options and routine maintenance and service of this product
must be performed by individuals who are knowledgeable about the procedures,
precautions, and hazards associated with AC power products.

WARNING: To prevent personal injury from earth conductor leakage current:

Do not operate the UPS while disconnected from the utility power source.

Disconnect load devices before disconnecting the UPS from the utility power source.

WARNING: To prevent personal injury, prepare the area and observe all materials

handling procedures when transporting the UPS. When fully assembled, the UPS weighs
29 kg (64 lb).

WARNING: To prevent personal injury, prepare the area and observe all materials

handling procedures when transporting the ERM. When fully assembled, the ERM weighs
28.6 kg (63 lb).

Preparing to install the hardware

Before installing the hardware:

1.

Be sure the necessary tools and materials ("

Required tools

" on page

12

) are available.

2.

Select an installation site ("

Selecting a site

" on page

13

).

3.

Prepare the equipment ("

Readying the equipment

" on page

13

) for installation in the rack.

Required tools

No. 2 Phillips screwdriver

T-20 Torx screwdriver

Advertising