Step 5. power off system step 6. cabling procedure – Interphase Tech CONDOR 4221 User Manual

Page 63

Advertising
background image

4221 Condor Hardware Installation Procedures

51

Step 5. Power Off System

Once the board is configured, ensure that the host system and peripherals are turned OFF.

Step 6. Cabling Procedure

The cabling procedure depends on how you wish to configure the system. Your options are summarized in Table 2-19.

Table 2-19. Ethernet Cable Options

TO IMPLEMENT

CABLING OPTIONS

Ethernet Single Channel AUI/10BaseT Daughter

Card

Front Panel I/O, connect a cable to P3 (RJ45) or P4 (DB15) on
the front of the Ethernet Single Channel AUI/10BaseT
Daughter Card.

Note: Only one cable or interface type can be used at a time.

Dual 10BaseT Ethernet Daughter Card

Front Panel I/O, connect cables to P3 & P4 (RJ45) on the front
of the Dual Channel 10BaseT Ethernet Daughter Card.

Dual AUI Ethernet Daughter Card

Front Panel I/O, connect cables to P3 & P4 (DB15) on the front
of the Dual Channel AUI Ethernet Daughter Card.

CAUTION

System power and peripheral power must be turned
OFF before attempting to install the Condor. Failure to
do so may result in severe damage to the board and/or
system.

Advertising