System installation – LevelOne GNS-2000 User Manual

Page 7

Advertising
background image

6

HDD Remove

1. Make sure the NAS Server is power off.
2. Open rear cover of NAS Server.
3. Pull out the HDD till HDD connector release then the HDD

can slide out of slot.

System Installation

Boot up

1. Connect the network cable to LAN port on the rear of NAS

Server. Connect the others end to your hub or switch.

2. Connect the supplied power adapter to a power outlet and

plug the power cord into NAS

Server’s power input on the

rear panel.

3. Power on

Locate the NAS Server’s power switch on the NAS Server
real panel. Press it once to power on the NAS.

4. The NAS Server self-test

The NAS Server will run a brief self-test. During the self-
test, all of NAS Ser

ver’s LED will be illuminated or flashing.

5. Booting up

When the self-test is complete, boot up will start. The
Ready LED will blink continuously, and the LAN LED will
blink occasionally. Boot up should take approximately 1-3
minutes.

6. Boot up completed

Advertising