Step-by-step instructions – Quartz QZ3111 User Manual

Page 5

Advertising
background image

Quartz Thermo installation guide

page 5

Step-by-step instructions

In addition to the guide below it is essential that the written instructions

overleaf are read and understood and that you have all the necessary

components (shown overleaf) before commencing installation. Failure to

install the product in accordance with these instructions may adversely affect

the warranty terms and conditions. Do not undertake any part of this

installation unless you are competent to do so. Prior to starting ensure that

you are familiar with the necessary plumbing regulations required to install

the product correctly and safely.

Quartz Thermo is supplied with universal fixings.

!

1

Mark the position for the four fixing points as outlined above.

2

Carefully remove the valve from its packaging and retain the mortar guard

for later use.

3

Remove the on/off lever assembly, if fitted,

from the valve by carefully pulling the

assembly away from the valve (a screw is

provided in the screwpack to secure the

on/off lever assembly to the valve towards

the end of installation).

4

65mm

150mm

Supply pipes hot on

left, cold on right

65mm

60mm
min. from
back face
of valve to
finished/
tiled wall
surface
(10mm
allowance
for tiles)

!

If installing the product built in to a solid wall, chase out a suitable recess in

the wall to receive the valve and pipe work. If installing the valve in a

concealed panel mounted situation, in most cases it will be necessary to first

install a suitable sound fixing in the cavity area before fixing the valve.

A hole of ø130mm is required to install the valve and gain access to inlet and

outlet connectors.

The valve needs to be mounted to the depth shown at the following centres.

The distance between the 15mm inlet centre pipe centres is 150mm as shown.

100mm max.
to finished/
tiled wall
surface

Advertising