Part 1, Specification – IAI America REXT User Manual
Page 85
Part 1
Specification
“Push operation”
This field defines the maximum distance traveled from the target position in push
operation.
Consider the mechanical variation of the work part and set an appropriate positioning band
so that the positioning will not complete before the actuator contacts the work part.
When the load is contacted, push operation is deemed complete
Speed
and the position complete signal turns ON.
Push
speed
Positioning band
(Maximum distance traveled in push operation)
Target position
(8) Zone+/-
These fields define the zone within which the zone output signal turns ON.
A separate zone can be set for each target position.
Only the zone setting for the currently executed position number becomes effective, and the
zone settings for all other position numbers remain ineffective.
[Rotary actuator in the index mode]
Zone signal ON area
Set values
Set values
Zone setting+: 315
Zone setting+: 70
Zone setting-: 70
Zone setting-: 315
P
ar
t 1
S
p
ec
if
ic
atio
n
Ch
apt
er
3
G
atew
ay
R
u
n
it
-85-